A progress invoice with the draw, the lumber package, and site cleanup on separate lines.
| Description | Qty | Rate | Amount |
|---|---|---|---|
| Progress draw, framing | 1 | 2,400.00 | 2,400.00 |
| Lumber package | 1 | 860.00 | 860.00 |
| Fasteners and hardware | 1 | 96.00 | 96.00 |
| Site cleanup | 1 | 180.00 | 180.00 |
| Waste bin | 1 | 140.00 | 140.00 |
| Item | Typical billing | Example |
|---|---|---|
| Progress draw, framing | Draw for this stage | $2,400.00 |
| Lumber package | Materials | $860.00 |
| Fasteners and hardware | Materials | $96.00 |
| Site cleanup | Flat fee | $180.00 |
| Waste bin | Flat fee | $140.00 |
Use a line that names the stage, such as framing, and the amount of that draw. The sample does that instead of one lump sum for the whole renovation.
Lien and holdback rules differ by province. This template does not calculate a holdback and it is not legal advice. Add a line if your contract requires one.
British Columbia charges 5% GST and 7% PST. The PDF lists them separately. Switch the province if the job was supplied elsewhere.